Temporary stop notice in planning
A temporary stop notice is an enforcement notice that can be issued by a planning authority if there is a breach of planning control, that is, where development is carried out without the proper planning permission, or where there is a failure to comply with a condition or limitation stipulated on permitted development rights.
It is an order for ‘relevant activity’ to cease on any part of the land to which the notice refers.
This power was introduced in 2004 by Section 171E of the Town and Country Planning Act 1990.
A temporary stop notice differs from a stop notice in that it does not need to be accompanied by, or follow, the issuing of an enforcement notice, instead, it can be issued on a stand-alone basis. The advantage of this is that it is faster, as the compliance period does not have to expire before the local authority can serve the notice, and so it is more effective where immediate action is necessary.
Issuing a temporary stop notice is at the discretion of the planning authority, on the basis that they believe there to be a breach for which it is ‘...expedient that the activity which amounts to the breach is stopped immediately.’ The requirements set out in the notice should prohibit only that which it is essential to prohibit in order to safeguard public safety or amenity in the neighbourhood, or to prevent serious harm being caused to the surrounding area’s environment.
A temporary stop notice is only valid for 28 days, after which, the local authority must take alternative of enforcement action if necessary.
Failure to comply with a stop notice can lead to prosecution and an unlimited fine.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.
London Build Fire and Security Expo
20-21 Nov and now with new Ambassador Programme..
The Scottish Building Safety Levy
Eight weeks of consultation closing on 18 November.
The grey, the brown and the golden rules of housing
shifting policies from the wild west of housing development.
Future proofing homes that are fit for purpose
Specification challenges and the role of plastic.
Thousands of new homes unlocked for brownfield sites
£68 million to 54 councils for neglected land into new homes.